Start-up and Operation of VTP Series Vertical Long Axis Pumps


This pump is recommended to start by reducing pressure. Open the valve when starting. After the deep well pump is used, it is required to measure the static and dynamic water level of deep well frequently. Every start-up must be pre-run. When the motor stops, check the height of its lubricating oil surface. If it is insufficient, it must add enough oil.